This report from Euro Rails is about the work that took place between April 28, 2018 and May 7, 2018. The railway tracks between Heerlen-Kerkrade centrum (the Netherlands) and Landraaf (NL) - Herzogenrath (Germany) were out of service for work. This was to renew the tracks between Heerlen and Kerkrade and for the electrification of the Landgraaf-Herzogenrath (Germany) section. It is interesting to see these construction works and the explanation makes it even more interesting. Dutch spoken.
Credits: Euro Rails
This report from Euro Rails is about the work that took place between April 28, 2018 and May 7, 2018. The railway tracks between Heerlen-Kerkrade centrum (the Netherlands) and Landraaf (NL) - Herzogenrath (Germany) were out of service for work. This was to renew the tracks between Heerlen and Kerkrade and for the electrification of the Landgraaf-Herzogenrath (Germany) section. It is interesting to see these construction works and the explanation makes it even more interesting. Dutch spoken.
Credits: Euro Rails